44 Pro Custom Products follow a Stage Process so you can track the progress of your order with regular updates that will be emailed to you.
Special Processing Stage: During high order volume periods, our factories may experience limited capacity which may increase lead times by an additional 7-14 Days. You will be notified through email if your order is included in this special processing stage. Orders with “special instructions” or orders that violate our custom text / design rules may be put in "pending status" and will not begin production stages until all specs are confirmed. All quoted lead times above are estimates based on our years of experience, but are not guaranteed.
FULL CUSTOM GLOVE STAGES
Approximate lead time = 6-8 Weeks
| Step Number | Stage | Estimated Time | Description |
| Order Placed | Payment Received | 1 Day | Order details sent to our production team and is placed into a production batch at our factory. |
| Stage 1 | Mold Cut | 7 Days | Your order is assigned to a craftsman who will gather the materials and cut the Glove leather parts from the hide. Leather stampings will be applied. |
| Stage 2 | Embroidery | 7 Days | Custom text, logos, additional graphics, and flags are stitched into the Glove. |
| Stage 3 | Stitching | 7 Days | Individual parts are stitched together to form your Glove. |
| Stage 4 | Forming | 7 Days | Glove is laced, then shaped and formed to pro spec. |
| Stage 5 | Quality Checks | 7 Days | Glove is reviewed for quality and order accuracy by our QC team. |
| Stage 6 | Preparing for Shipment | 7 Days |
Your glove has begun the shipment process. This step includes the transit time from our factory to our warehouse. Note: It is normal to see delays in Stage 6 during high volume sales due to warehouse capacity constraints. Once your order has been processed for shipment you will be emailed a tracking number directly from the carrier. |
SPEED CUSTOM GLOVE STAGES
Approximate lead time = 3 Weeks
| Step Number | Stage | Estimated Time | Description |
| Order Placed | Payment Received | 1 Day | Order details sent to our production team and is placed into a production batch at our factory. |
| Stage 1 | Building your Glove | 7 Days | Your order is assigned to a craftsman who will gather the materials and cut the Glove leather parts from the hide. Leather stampings will be applied. |
| Stage 2 | Lacing / Forming | 7 Days | Your glove is laced, then shaped and formed. |
| Stage 3 | Preparing for Shipment | 7 Days | Your glove has begun the shipment process. This step includes the transit time from our factory to our warehouse. Once your order has been processed for shipment you will be emailed a tracking number directly from the carrier. |
CUSTOM BATS STAGES
Approximate lead time = 5-6 Weeks
| Step Number | Stage | Estimated Time | Description |
| Order Placed | Payment Received | 1 Day | Order details sent to our production team and is placed into a production batch at our factory. |
| Stage 1 | Raw Bat Production | 7 Days | Raw material for the bat is formed and heat treated. Art screens are ordered for graphic decals. |
| Stage 2 | Base Paint Application | 7 Days | Base paint color is sprayed on to the bat and fully cured. |
| Stage 3 | Decal & Top Coat Application | 7 Days | Graphic Decals are applied to the bat and a protective clear coat is sprayed covering the barrel and handle. |
| Stage 4 | Bat Assembly | 7 Days |
Vibration technology, end cap, handle taper, and grip are installed on the bat. |
| Stage 5 | Quality Checks | 7 Days | The custom bat is reviewed for quality and order accuracy by our QC team. |
| Stage 6 | Preparing for Shipment | 7 Days |
Your custom bat has begun the shipment process. This step includes the transit time from our factory to our warehouse. Note: It is normal to see delays in Stage 6 during high volume sales due to warehouse capacity constraints. Once your order has been processed for shipment you will be emailed a tracking number directly from the carrier. |
CUSTOM BATTING GLOVE STAGES
Approximate lead time = 5-6 Weeks
| Step Number | Stage | Estimated Time | Description |
| Order Placed | Payment Received | 1 Day | Order details sent to our production team and is placed into a production batch at our factory. |
| Stage 1 | Building your Batting Glove | 21-28 Days | Your order is assigned to a craftsman who will prepare materials, cut, and sew your custom batting glove order |
| Stage 2 | Preparing for Shipment | 3-5 Days | Your batting glove has begun the shipment process. This step includes the transit time from our factory to our warehouse. Once your order has been processed for shipment you will be emailed a tracking number directly from the carrier. |